DA vs CDC: What's the Right Approval for Your Build?

August 22, 2025

Building or renovating in WA? One of the first things you will hear is “Do you need DA or CDC approval?”


The two main paths you’ll come across are DA (Development Application) and CDC (Complying Development Certificate). Knowing which one suits your project can save you a stack of time, cash and stress. A bit of know-how here can really smooth out the whole process and help avoid delays before you even break ground. 


Let’s clear up the difference so you can move forward with confidence.


Understanding DA vs CDC Approvals


Both DA and CDC are formal approvals you need before breaking ground. DA gives you a bit more room to move on design, but it takes longer and often means more paperwork. CDC, on the other hand, is quicker and tends to cost less, but your plans need to tick every box in the rules upfront.


Choosing the right path between DA vs CDC has a big impact. It can change how long things take, how much you'll need and how flexible your design can be. Picking the best path from the start keeps things moving and your budget in check.


Definition of CDC vs DA Approval


Before you start building or renovating, you’ll need the green light, either through a CDC or a DA. Which one depends on how simple (or not) your project is.


CDC (Complying Development Certificate)


A CDC is your fast-track ticket for simple builds. It comes from your local council or a private certifier. Your plans must meet all the rules with no flexibility. This option suits low-risk, rule-abiding projects.


Common CDC projects:


  • Secondary dwellings for extra rental income or family.
  • Non-structural internal renovations.
  • New homes on land that already meets planning codes.
  • Sheds, fences, pools and carports within set limits.


DA (Development Application)


A DA is the more flexible route, but takes longer. Your local council assesses it under WA’s Planning and Development Act 2005. This is where you go when your plans stretch the standard rules. It suits projects needing careful review or negotiation. Expect extra reports and conditions, but more freedom in design.


Examples of when you need a DA:


  • Major home renovations that change the structure.
  • Building in heritage-listed zones.
  • Projects that break existing zoning rules.
  • Plans that exceed height or site coverage limits.


DA vs CDC: Quick Comparison


Here’s a quick side-by-side guide to help you choose CDC vs DA approval for your build. 


Why Knowing DA or CDC Approval is Necessary


Before you get too far into planning or picking finishes, it’s worth knowing why your approval type matters.


Helps avoid legal and financial penalties


Getting the wrong approval or skipping the process altogether can land you with fines or even a stop-work order, which no one wants mid-build.


Ensures compliance with local and state laws


Each council and state has rules in place and picking the right approval helps keep your build above board.


Saves time and streamlines planning


Knowing upfront which track you're on can speed things up and stop you from going back and forth with paperwork.


Prevents design changes mid-project


No one likes changing plans halfway through, getting the right approval early helps keep your design intact.


Affects construction timelines


Some approvals take longer than others, so picking the right one can make a big difference to your start and finish dates.


Impacts resale or investment potential


If your property isn’t built under the right approval, it can raise red flags for future buyers or valuers.


Influences costs, consultants and reports


Depending on your approval type, you might need different documents or professionals, which can shift your budget.


Helps define clear project expectations early


Knowing what’s allowed from the start means fewer surprises and smoother chats with your builder or designer.


Between CDC vs DA Approval, Which Path to Choose?


The right choice depends on what you’re building, where it’s going and how quickly you want to get started. A few important things can point you in the right direction:


Local council policies


Some councils are stricter than others and not every area allows CDC approvals, so it pays to check first.


Type of build or renovation


Straightforward projects like a standard granny flat may fit CDC, while more detailed or unique builds often need a DA.


Slope, shape and zoning of land


If your block sits on a hill or has tricky zoning, that might push you toward a DA, especially if it falls outside standard guidelines.


Timeframe to begin construction


Need to start ASAP? A CDC can often be faster, provided your plans comply with all the requirements.


What Can Delay the Process of DA or CDC Approval?


Even with the best planning, a few hiccups can slow things down. Being aware of common delays gives you a better shot at avoiding hold-ups.


Incomplete or inconsistent documents


Missing details, outdated plans or mismatched forms can send your application back and forth, adding weeks to the timeline.


Objections from neighbours


If someone nearby raises concerns about privacy, noise or how the build affects their property, it can trigger extra steps.


Required referrals


Some builds need extra sign-off from specialist bodies, which can take extra time depending on who’s involved.


Environmental impact issues


If the site affects bushland, water runoff or wildlife, extra checks might be needed before approval can go ahead.


How to Speed Things Up with Your CDC or DA Application


Nobody wants to get stuck waiting on their CDC vs DA approval. A few smart steps at the start can help things move quicker and smoother right through to approval.


Book a pre-lodgement meeting with the council


This gives you a chance to flag any red tape early and ask questions before anything's officially submitted.


Work with an experienced professional


Having an expert builder, like Prestige Homes and Granny Flats, on your side who knows the process back to front can save time, stress and second-guessing.


Triple-check plans for compliance


Spotting small errors before lodging your plans can save a heap of back-and-forth later.


Lodge all required documents at once


Submitting everything in one go helps avoid delays from chasing missing info or filling in the blanks mid-assessment.

Which Builds Are Exempt from Needing DA or CDC Approval?


Not every job needs to go through DA vs CDC. Some smaller, low-impact projects can be knocked out without a formal approval, so long as they follow the rules.


Sheds under 10m² and 3m high


A basic garden shed usually gets exempted if it’s small enough and kept away from boundaries or easements.


Low fences (within certain heights/materials)


Standard front or side fences can be exempt if they meet height limits and don’t block visibility.


Decks, awnings and pergolas (within limits)


These might not need approval if they stay under certain heights, sizes and setbacks.


Solar panels or water tanks


Sustainable add-ons like these are often exempt too, as long as they’re installed safely and don’t impact neighbours.


Always refer to local R-Codes


Every council has its own set of rules, so double-checking your local Residential Design Codes is a smart move before you start.


Commonly Required Documents for DA vs CDC Applications


Before a council or certifier gives you the go-ahead, you’ll need to pull together a solid pack of documents. Having these ready upfront can make the whole process smoother and quicker.


Required for both:


Architectural drawings


These show what you’re planning to build, like floor plans, elevations and sections drawn to scale.


Site survey


This maps out your block, including boundaries, levels and any existing structures or features.


Structural and stormwater designs


Engineers will need to confirm your build can stand strong and manage rainwater runoff properly.


BASIX certificate


This proves your project meets NSW’s energy, water and thermal comfort targets if required for the job type.


DA-specific reports:


Environmental effects statement


Needed for sites where your build could impact natural surroundings, like trees, waterways or habitat.


Bushfire report


If you're in a bushfire-prone area, this shows how the design addresses fire safety and risk.


Geotech and soil testing


Engineers might request this to check soil conditions, which affect footings and slab design.


Arborist/Heritage/Traffic reports


Depending on the site, you might need reports covering nearby trees, heritage-listed items or how traffic and access will be managed.


CDC vs DA Approval: Which One Should You Choose?


Not every build is the same and neither is the approval path. Picking the right one early can help set your project up for a smoother run.


Choose DA if:


Your plans are a bit more involved or fall outside standard rules. DA gives you room to adjust the design and is often the go-to for builds in bushfire zones, heritage areas or unusual blocks.


Choose CDC if:


Your design complies with all the planning and sticks to the rules. CDC is usually quicker, with less back-and-forth and suits projects that follow set standards from the start.


Trust Prestige Homes & Granny Flats Professionals for Your Build


Prestige Homes & Granny Flats can guide you through the entire DA or CDC approval process, helping you avoid common traps and get building sooner. Whether you're planning granny flats or custom homes. We bring deep experience across all stages of planning and construction to make DA vs CDC approvals easier to manage from day one.


Get in touch with our team today to book a consultation and start your build with confidence.

June 25, 2025
Make the most of your land with dual key homes. We break down the pros, cons and expert tips to help you decide if it’s the right move for your block in WA.
cost to build custom home
May 28, 2025
Planning your dream home? We've unpacked the factors that affect the cost to build a custom home in WA, with tips on budgeting to avoid surprise expenses!
building a house on a narrow lot
April 15, 2025
Discover the benefits of building a house on a narrow lot! Learn about smart designs, vertical spaces and creative layouts to make the most of your property.
modern granny flat designs
March 15, 2025
Looking for modern granny flat designs? Explore top styles, smart layouts and must-have features for a stylish, functional and energy-efficient living space.
what adds value to your house
March 15, 2025
Learn what adds value to your house before you build! From stylish builds to energy-efficient features, get expert tips from Prestige Renovations!
granny flats in wa no longer need council planning approval
February 19, 2025
Understand how to process a granny flat approval in WA with no council approval needed. Find out if your property qualifies and expert guidance to make it possible.
master suite design ideas
December 5, 2024
Looking for stunning master suite design ideas? Our guide covers the best tips, from storage solutions to colour schemes, helping you create your dream retreat today!
convert garage to granny flat
November 8, 2024
Convert garage to a granny flat and maximise your property's potential! Our expert guide covers regulations, cost factors, and benefits. Read more today!
building two storey house
October 27, 2024
Maximise your space by building a two-storey house. Our blog covers the benefits, challenges, and expert tips for a successful build. Start planning your dream home today!
September 26, 2024
Learn the ins and outs of renting out a granny flat. From maximising benefits to the do's and don'ts, we've got you covered. Read our expert blog today!